Beth 2.0 · Team operating guide

Read, report and complete work in Infinity.

A detailed walkthrough for workers, reviewers and delivery leads: find the right package, agree readiness, report progress and blockers, submit evidence, record acceptance and connect each result to the monthly demonstrations.

23 minutes · 23 chapters · Premium ElevenLabs narration · Board fields checked 13 October 2026 · Public guide; the live Infinity board follows its own access permissions.

Reporting templates

00:00 · From a card to a working Beth

Read or search the transcript

What “clear a card” means

Execute→Attach evidence→Ready for review→Reviewer acceptance→Done + Completed

Keep the card and evidence as the delivery record. A ticked checklist does not establish acceptance. Parent features require their own integrated demonstration and reviewer decision.

Worked reports, test counts and animated stage changes are illustrative examples. No live task assignments, reports, checklists or completion states were changed to make this guide. The reporting rhythm is a team convention; automated reminders, stage enforcement and parent roll-up are not implied.

Open the guided reviewer worksheet to test an assigned work package, upload protected evidence and submit an acceptance, return or hold record. Signed-in assignments save to Beth and send review comments automatically to the matching Infinity card. Check the delivery receipt; a pending delivery is not a successful handoff.

Templates for a real working card

Use Latest report for the current position, Last reported for the actual report time, Attachment or approved links for evidence, and Comments for discussion and the dated reviewer decision.

Latest report

Replace every prompt with the actual position and evidence. Record the real reporting time; keep unrun and failed checks explicit.

Blocker / decision needed

Replace every prompt with the actual position and evidence. Record the real reporting time; keep unrun and failed checks explicit.

Reviewer decision

Replace every prompt with the actual position and evidence. Record the real reporting time; keep unrun and failed checks explicit.

Sprint close report

Replace every prompt with the actual position and evidence. Record the real reporting time; keep unrun and failed checks explicit.

Read these references together

Source blueprint 2026-10-09.1 · Six-month plan 2026-10-12.2. Relative weeks begin at the approved kickoff. Current Sprint and Next Sprint are the native selection labels; the weekly plan does not automatically assign calendar dates.

Search the walkthrough

01 · From a card to a working Beth 00:00

Welcome to the Beth delivery board guide. This walkthrough is for the people doing the work, reviewing it, and managing the six-month project. We will follow one work package from its first reading to an accepted result. You will learn where to look, what to update, how to report a blocker, and when a card can actually be cleared. Clearing means completing the agreed work and obtaining reviewer acceptance. Keep the card and its evidence as the project record. The worked reports and stage changes in this video are illustrative examples. They do not represent actual completed work on the live board.

02 · Which document answers which question? 00:45

Start with the relationship between the documents. The master scope on beth two dot top defines the intended feature, work package and acceptance requirements. The six-month sprint plan proposes when the work happens and where its dependencies sit. Infinity is the operating record: the assigned people, current stage, next action, blocker and latest report. Evidence records show what actually happened. Read these together using the package code. A card is not a second specification to rewrite independently. If the source definition changes, the delivery lead reviews the impact and updates the affected cards. The links support traceability; they do not imply automatic synchronization.

03 · Find your work on the actual board 01:48

On the Beth Infinity board, choose the relevant folder. The folders are Existing Prototype Work, Cloud release, Pilot readiness, Later enhancements, and Delivery and Traceability Guides. Use the package code to find the precise item. The board also uses Work Area labels such as Customer interface, Backend and integration, Service knowledge and quotation, and QA and reporting. Pay attention to what a view is grouped by. The current view named By stage can display columns grouped by Work Area. Those columns are not necessarily execution stages. Open the card and read its Stage field to know whether it is upcoming, being worked on, blocked, or awaiting review.

04 · Understand parents, children and checklists 02:43

There are three levels to understand. A parent task describes a feature outcome. Its child subitems are separately assignable work packages. Inside each package, Sub-tasks are the numbered execution checklist. For example, P zero four is the knowledge feature. P zero four point two is a child package for retrieval and citation checks. Its numbered steps are the work to perform. The current blueprint has one hundred and thirty references, including thirty-two parent outcomes and ninety-eight other records. Those other records include work packages, prototype checks and operating guides. Do not add a parent again when counting the effort of its children. Parent and child checklists do not automatically synchronize.

05 · Read a card in the right order 03:44

Now open our example, P zero four point two: Verify retrieval and citation support against claims. Read the code and title first. Then read Description, especially the required outcome and the linked source definition. Follow the dependency links. Read all the numbered Sub-tasks, and finally read Evidence required. The outcome is that Beth cites passages that actually support its material claims for the relevant facts and tax period. This is more than showing a link under a reply. The package asks for traceable source versions, claim-support checks and tests for conflicting or unsafe source text. Evidence required describes the proof to produce. It is not proof that the work has already passed.

06 · Follow source and dependency links 04:46

The description contains clickable references to the exact scope anchor and the corresponding sprint-plan entry. Use them rather than guessing what a code means. Our example depends on P zero four point one and P fourteen point two. Open those references and check the prerequisite evidence needed for this package. A dependency being labeled Done is useful, but you still need the applicable version and accepted result. A related card can be complete while its output is unsuitable for your current change. If an anchor is broken or the card conflicts with the source, record the mismatch and ask the accountable owner to resolve it before you assume a new requirement.

07 · Assign people, not just roles 05:39

Owner role says what kind of skill the package needs. It does not mean a real person has been assigned. Assignees identifies the people doing the work, and Reviewer identifies the person responsible for the acceptance decision. Agree one accountable worker and a designated reviewer before releasing a package. Use Due Date for an agreed checkpoint, not an arbitrary date copied from a relative week. Priority helps sequence work; it does not prove readiness or quality. The worker and reviewer should agree the required evidence and scope version up front. A blank assignment is a coordination gap, even if the card already contains a thorough checklist.

08 · Turn relative weeks into an active sprint 06:37

The plan uses relative project weeks. Our example is proposed for week eleven, sprint eleven. The native Sprint Selection field currently offers Current Sprint and Next Sprint. It does not contain twenty-six separate weekly labels. The delivery lead converts the proposed sequence into an actual working sprint after agreeing kickoff, staffing, capacity, dependencies and reviewer time. Select Current Sprint only when that package belongs in the agreed active sprint. Use Next Sprint for the next agreed group. Put the agreed checkpoint in Due Date and explain schedule changes in the report. Do not silently move a date and leave the milestone plan unchanged.

09 · Use the six stages consistently 07:34

The board has six execution stages. Upcoming holds work waiting for release. To Do means the prerequisites, assignment, reviewer and checkpoint have been agreed. In Progress means actual work has started. Blocked means a specific dependency or decision prevents the required progress. Ready for review means the evidence is submitted and a reviewer can make a decision. Done means that decision accepted the required result. A package can go back from review to In Progress when corrections are needed. These are the operating meanings for Beth; moving a card does not automatically enforce them. The team must apply the acceptance rules consistently.

10 · Check readiness before starting 08:32

Before starting, do a short readiness check. Can you explain the required outcome in your own words? Is the source version clear? Have a worker and reviewer been named? Are the prerequisite outputs available and usable? Do you know the environment, expected evidence and relevant test cases? Is the checkpoint realistic for the available capacity? For P zero four point two, this includes approved source passages and agreed expert benchmark cases. If something essential is missing, keep the package in Upcoming or record a blocker, depending on whether it has been released. Do not begin by inventing expert approval or treating an unreviewed source as approved.

11 · Do the work and keep the steps honest 09:36

When work begins, move the package to In Progress and update Next action. Work through the numbered Sub-tasks. Tick a step only when its required result exists. A successful code change is not automatically a successful test, and an unrun check stays unrun. Keep the source version, build or configuration, test inputs and expected results with the evidence. Use Attachment or approved retrievable links for the actual proof. For the citation package, that could be a redacted answer-to-passage trace and a record of a table extracted from the original PDF. Next action should identify the next concrete action and who will perform it, rather than simply saying ongoing.

12 · Write a useful Latest report 10:36

Use Latest report for the current structured progress snapshot, and Last reported for the actual time you submitted it. Start with the package code, version and environment. State the outcome reached since the last checkpoint. Link the evidence and list exact expected and actual test results. Separate checks that passed, failed and were not run. State remaining work, any blocker, and the next action with an accountable person and target. Avoid claims such as ninety percent done without an explanation of what remains. Comments can hold discussion and reviewer decisions. Activity Log helps show field changes, but it is not an acceptance decision. A short, specific report is more useful than a long diary.

13 · Model report: partial work, clearly stated 11:38

Here is an illustrative report, not a real test result. P zero four point two, staging build example version one. Approved source identifiers and versions are recorded in the evidence bundle. Passage tracing is attached for cases A, B and C. Three of five table cases pass; two fail because an exception row is separated from its rate. The source-outage check has not been run. Remaining work is to repair table boundaries, retest the failed cases and run the outage case. The next action belongs to the AI and data engineer before the agreed review checkpoint. Review is not requested yet. This gives a manager a useful position without falsely describing unfinished checks as complete.

14 · Report a blocker so someone can resolve it 12:44

A blocker report must say what is missing, who can resolve it, what decision or action is needed, the agreed checkpoint, and the consequence of delay. For example, historical applicability of a source has not received expert approval. Ask the knowledge lead to approve, correct or reject that version by the agreed checkpoint. Explain that the citation package and the Month three prototype are affected. State what useful work can continue meanwhile. Put the concise request in Blocker slash decision needed and repeat its impact in Latest report. Use Blocked when the required progress cannot proceed. Alert the accountable person through the agreed team channel; this board guide does not configure automatic notifications.

15 · Prepare an evidence-backed review handoff 13:45

Move a package to Ready for review only when the review bundle is usable. Include the agreed deliverable, checklist results, explicit exceptions and retrievable evidence. Check that the reviewer can open the links and identify the exact inputs, source version and build. Remove credentials and unnecessary personal or client information from shared proof. For P zero four point two, include claim-support tests, original PDF versus extracted table checks, the ingestion manifest, active-version proof and held-out retrieval results. Evidence required is the instruction; Attachment and evidence links are the actual material. Name the reviewer and record the review request. Complete checkboxes alone do not make an evidence bundle sufficient.

16 · Reviewer: accept or return with a clear decision 14:43

The reviewer compares the evidence with the source acceptance requirements and checks whether the required outcome is demonstrated. A return decision names the failure, the expected behavior, the observed behavior, and the correction or additional proof needed. For example, the exception row is missing from a tax table, so the generated answer cannot be accepted. Return the package to In Progress, preserve the failed evidence and retest after correction. An acceptance decision records the reviewer, date, exact tested version and evidence references. Any allowed limitation needs an explicit decision by the appropriate owner. The worker should not silently approve their own work by moving the stage to Done.

17 · Clear the card and keep the record 15:41

Once the reviewer accepts the required result, the authorized person can move the card to Done and make Completed consistent with that decision. Update the latest report to point to acceptance, and make Next action and the blocker field reflect the actual final state. Preserve the card, its checklist, links and history. Do not delete or archive a card simply to remove it from an active view. Filter the view to focus on active work instead. If a later regression invalidates the accepted result, reopen or link the corrective work according to the team policy, and assess the effect on dependent packages and milestones. Clearing the view and accepting the work are different actions.

18 · How child packages complete a feature 16:37

Accepting P zero four point two finishes that package; it does not finish the whole knowledge feature. The parent owner checks all required child packages and their dependency versions. Then the feature must work as an integrated outcome, not merely as separate successful components. A reviewer records the parent acceptance against its own checklist and original scope. Child checklist ticks do not automatically update the parent. The accepted feature contributes evidence to the monthly demonstration. This is the chain from execution step, to work package, to feature, to milestone. A project with many closed small cards can still fail its key milestone if an essential feature cannot be demonstrated end to end.

19 · Run a practical weekly rhythm 17:34

Use a simple weekly rhythm. At sprint start, the delivery lead agrees the intended accepted outcome, readiness, capacity and reviewer availability. During work, each worker keeps Next action and Latest report current; agree a daily update time rather than leaving cards untouched for a week. Raise material blockers as soon as they are known. Before the review checkpoint, submit the evidence bundle and reserve time for correction. At sprint close, demonstrate the result, record acceptance and explicitly plan unfinished work. The delivery lead reports accepted outcomes, blocked critical dependencies, decisions needed and changes to the next sprint. This is an operating convention, not an automated reporting system already installed on the board.

20 · Connect weekly work to six monthly demonstrations 18:39

The six-month plan asks for visible progress every month. At week four, demonstrate account and intake persistence with account isolation. At week eight, demonstrate expert submission, return, correction and reviewed publication with an audit trail. By week thirteen, the midpoint, demonstrate a real working prototype: configured model, reviewed retrieval and citations, profiling, indicative quotation, specialist matching and a saved case. At week seventeen, show supervised case handling and human handoff after the admission gate. At week twenty-one, show measured pilot improvements. At week twenty-six, show connected operations and the launch decision. Each demonstration needs stakeholder-operable evidence. A presentation or a canned chat does not substitute for the midpoint working prototype.

21 · Report progress without misleading percentages 19:55

For management, report progress as accepted outcomes and remaining risk. Name the packages accepted this sprint and the features demonstrated. Show critical prerequisites not yet accepted, the review queue, and the evidence position for the next monthly milestone. Record decisions with an owner and checkpoint. Raw card counts can mislead because packages differ in effort and importance. Do not count parent outcomes again alongside their children. If you use a percentage, explain its denominator and whether it measures checklist execution, reviewer acceptance or milestone evidence. These are different measures. A green board is useful only when the accepted results actually work together and unresolved risk is visible.

22 · What counts as project completion? 20:55

Project completion is an approved delivery decision. The required outcomes for the agreed release scope must be accepted, and the integrated demonstrations and release gates must pass. Remaining defects, limitations and risks need explicit decisions. The team needs operating access, recovery and rollback evidence, monitoring, runbooks and a named operating owner. Knowledge accuracy and freshness, privacy and security checks must be covered by the agreed acceptance requirements. Complete the handover and obtain stakeholder acceptance. The month-six decision may be go, limited release or hold. It is not an automatic launch because twenty-six weeks have elapsed. Nor does every later enhancement need to be complete if it is outside the approved release boundary.

23 · Your quick operating checklist 22:01

Here is the routine to take back to the board. Find the exact package and read its source definition. Agree the worker, reviewer, prerequisites and checkpoint. Execute the steps and keep the report honest about tests, blockers and remaining work. Submit retrievable proof. Resolve review findings, then record acceptance and demonstrate how the feature works with its neighbors. Use the chapter list to revisit any step, and the report templates beside the video when you update a real card. G zero one is the delivery reporting reference, G zero two covers traceability, and the sprint plan connects this operating routine to each monthly outcome. Accepted working results are what move Beth toward completion.